The project consisted of a new warehouse for St Modwen with office spaces fitted out to CAT A standard. Services included, mains electrical distribution, internal and external lighting, fire alarm, disabled alarm, car charging points and lightning protection. External fire hydrants, external gas supply, VRV comfort cooling and heating system serving the offices, domestic hot and cold water including electric water heating, sanitary ware and above ground drainage, electric panel heating, mechanical ventilation via heat recovery units and twin extract fans. Central controls system.
KEY SERVICES:
- Design
- Gas service to capped off supply in warehouse
- Incoming MCWS
- Fire Hydrant system (Standard MDPE)
- Hot & cold water services incl. Electric water heaters
- Major leak detection for BREEAM
- Electric panel heating
- Air conditioning, VRV ducted system
- Mechanical ventilation
- Above ground soil & waste
- Sanitary ware
- Sanitary ware shut off systems, BREEAM WAT 03
- Main and sub main LV distribution
- Office lighting (incl. warehouse exits)
- Fire alarm Disabled alarm
- Dock levelers & auto door supplies
- External lighting
- Lightning Protection
- Earthing & bonding
- Car charging points (2 No dual comms connected bollards)
- Disabled refuge system
Project:
Chippenham Gateway
Location:
Chippenham Wiltshire
Main contractor:
Winvic
Client:
St Modwen
Architect:
UMC Architects
Size:
106,000ft²