The project consisted of the addition of a new office block to serve the recently completed BMW pressings plant in Swindon. Services included mains electrical distribution, lighting, power, fire alarm and access control. Heat recovery and general extract mechanical ventilation, domestic water services, sanitary ware and above ground drainage.
KEY SERVICES:
- Design, Mechanical ventilation
- Electric Panel Heating
- Domestic H&C water service
- Sanitary ware
- LV distribution & containment systems
- Lighting & emergency lighting
- Fire alarm and disabled alarm
- Structured cabling
- Access control
Project:
BMW Press Shop
Location:
Swindon, Wiltshire
Main contractor:
Glencar
Client:
BMW
Architect:
BCR Infinity Architects
Size:
N/A